SEPTEMBER QUARTER HIGHLIGHTS:
•
Exploration continued at Batangas Gold Project, with exceptional new gold results from South
West Breccia, Main Lode extension and a new target defined at Tamarind in the footwall of
previous high-grade results at Lobo Prospect
•
Progress towards development of the Batangas Gold Project continued, including:
-
-
Key Definitive Feasibility Study (DFS) capital and operating cost inputs completed
Permitting advanced, including provision of final responses to questions from the
Environmental Management Bureau (EMB) to allow a recommendation for grant of the
Environmental Compliance Certificate (ECC)
•
Letter of Intent signed to farm out a non-core but highly prospective tenement package at
Batangas
•
New agreement negotiated (signed post end of the quarter) with strategic financing partner
Bluebird Merchant Ventures, that increased Stage 1 funding to complete the DFS and
permitting to US$1.7 million. US$850,000 to be repaid to RMX on Stage 1 funding due 27
November 2015
•
A$0.5 million cash and no debt at the end of the September quarter
BATANGAS GOLD PROJECT
New, high-grade gold results and large new gold target to be drilled at Lobo:
As announced to the ASX on 7 September 2015, exceptional new high grade gold trenching and surface rockchip results were produced from extensions of the South West Breccia (SWB) Main Lode, on the Lobo
Prospect at the Company’s Batangas Gold Project in the Phillipines.
The new trenching results are tabulated below and include, from extensions to the SWB Main Lode: Trench
50: 7m @ 20.5 g/t Au; Trench 47: 7m @ 11.5 g/t Au including 1m @ 50.9 g/t Au; and Trench 52: 5m @
8.83 g/t Au including 1m @ 29.3 g/t Au. For locations see Figures 1 and 2.
These new results are from trenches in the vicinity of the very high-grade gold surface rock-chip results
announced to ASX on 24 August 2015, that included 90.4 g/t Au, 23.1 g/t Au and 17.9 g/t Au, and a surface
rock-chip result of 31.7 g/t Au from extensions to the Main and Hangingwall Lodes at SWB.
From these new trenching results, the Company has now defined a 40 metre strike length extension to the
SWB Main Lode, that is open to the southwest towards Japanese Tunnel, and has not been effectively drilled
within the top 50 metres from surface.
The extensions to the SWB Main Lode projects along strike 400m to the south west of SWB to the new
Tamarind target. Tamarind is associated with a large, multi-element, soil anomaly (see Figure 2) and
1
ASX code: RMX
ABN 40 119568106
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
occurs up slope, and in the footwall, of previous very high grade surface vein intersections at Limestone,
including Trench 34: 3.5m @ 25.9 g/t Au including 1.5m @ 56.8 g/t Au (ASX release 2 February 2015) and
Trench 13: 2.6m @ 28.6 g/t Au including 1.5m @ 45.9 g/t Au (ASX release 7 January 2014). A new
interpretation suggests that Limestone is possibly a down-faulted wedge of high grade vein material,
displaced from the SWB Main Lode by a normal fault, and that extensions to the main SWB lode structure are
associated with the much stronger and larger soil anomaly at Tamarind, covered by a veneer of Andesite
scree and cobbles, and limestone to the south west.
Further trenching is planned to be completed during the December quarter, including test pits/shafts to be
excavated through colluvium covering the Tamarind target. Then drilling is planned to test the two new
SWB Main Lode targets: firstly at SWB Extended and secondly at the Tamarind target, with the potential to
upgrade the Lobo / SWB resource for conversion to ore reserve on completion of the DFS.
Table 1: Trenching results, South West Breccia Lode, Lobo
North
East
Azi
From
Trenching
(grid)
(Grid)
Mag
(m)
SWB TR50 Main Lode
10,103 10,050
140°
1.0
SWB TR47 Main Lode
10,107 10,051
140°
1.0
Including
10,108 10,056
140°
7.0
SWB TR48 Main lode
10,092 10,050
140°
10.0
SWB TR52 HW/Main Lode
140°
0.0
10,086 10,044
Including
140°
1.0
10,086 10,045
SWB SW_TR38 Main
10,050 10,098
Float rockchip
To
(m)
8.0
8.0
8.0
11.5
5.0
2.0
Length
(m)
7.0
7.0
1.0
1.5
5.0
1.0
N/A
Au g/t
Ag g/t
20.5
11.5
50.9
25.4
8.83
29.3
151.6
1.84
1.30
1.00
2.07
1.40
2.00
2.2
Figure 1: Plan of South West Breccia Extended, with new high grade surface results
ASX code: RMX
ABN 40 119568106
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
2
Figure 2: Plan of South West Breccia Lode structure with new results and Tamarind Target
Definitive Feasibility Study (DFS) close to completion:
Significant progress was been made towards completion of the Definitive Feasibility Study (DFS) during the
September quarter.
Process engineering to finalise processing plant capital and operating costs was completed. The processing
flow sheet has retained the Scoping Study (released to the ASX 20 March 2014) grind sizes and production
rates and capital and operating costs are in line with expectations and similar to those reported in the
Scoping Study (including capital costs for construction and installation of a new processing plant of
approximately US$9 million).
The water balance model and residue (tailings) and waste materials properties and geochemical testing
were also completed. Geotechnical drilling is now planned for December 2015 , which will provide the final
inputs to allow final design of the proposed residue storage facilities, which will utilise the thickened tailings
disposal method.
The Company intends that the potentially upgraded resource model will be combined with a metallurgical
model and geotechnical drilling information before final mine design and re-scheduling for conversion to
scheduled ore reserve on completion of the DFS.
Other inputs, including site infrastructure (roads, water storage and power generation, etc.), administration,
tax inputs and miscellaneous costs will be finalised for input to the financial model.
ASX code: RMX
ABN 40 119568106
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
3
Permitting; local government endorsement and all Environmental Compliance Certificate inputs:
During the September quarter the Company, through its local subsidiaries in the Philippines, submitted all
final responses to questions from the Review Committee of the Environmental Management Bureau (EMB)
to allow a recommendation to be finalised for approval of the Environmental Compliance Certificate (ECC).
Approval of the ECC, when achieved, will represent a major milestone in the overall approval process for the
Batangas Gold Project development.
The Company is also required to achieve approval of the final Declaration of Mining Project Feasibility
(DMPF), and this requires the endorsement of two out of the three Local Government Units (LGU’s). The
LGU’s include the group of ten key Barangay (township) Councils, the Lobo Municipal Council and the
Batangas Provincial Government.
The Company already has endorsement from the group of ten key Barangay (township) Councils (ASX
release 23 January 2015), and had also received Lobo Municipal Council endorsement (ASX release 20 May
2015). However, the Company was notified that the Lobo Municipal Council has withdrawn its previous
endorsement for the Project, citing some environmental and “social acceptability” concerns. The Company is
seeking to address these concerns and has submitted a petition for re-consideration to the Lobo Municipal
Council in order to restore their endorsement in due course.
Red Mountain believes that achievement of the ECC from the EMB will significantly assist in gaining
endorsement from the Lobo Municipal Council and also the support of the Batangas Provincial Government.
The retained endorsement of all 10 potentially affected Barungay Councils and strong demonstrations of
support from the local community (ASX release 28 July 2015) is strong evidence of the social acceptability of
the project that is built on over 12 years of the Company’s Philippines subsidiaries working alongside the
local community.
Once the ECC is granted and the Company has the necessary two out of three LGU endorsements, the DMPF
will proceed to the central Mines and Geosciences Bureau (MGB) for final approval. The Company will
respond to feedback on the DMPF submissions from the MGB prior to a recommendation from the MGB to
the Secretary of the Department of Environment and Natural Resources (DENR) for final approval and
signing. This is the final step in the central government permitting process required to allow development of
the Batangas Gold Project.
Letter of Intent to farm out a non-core but highly prospective tenement package at the Batangas:
On 2 September 2015 the Company announced it had signed a Letter of Intent (LOI) to farm out a non-core
but highly prospective tenement package at Batangas. The LOI has been signed by Red Mountain’s 100%
owned Philippines subsidiary MRL Gold Inc. (MRL Gold) and Korean private company JIWON Resource Corp.
(JIWON).
Under the terms of the LOI, JIWON will fund exploration and other related activities on the El Paso
Exploration Permit 009 (El Paso EP) to earn up to 75% through expenditure of USD 2 million over a
maximum 3 year period. Other Exploration Permits (EP’s) within the designated Joint Venture Area (JV
Area) see Figure 3, can be added to the JV.
JIWON are required to meet a minimum funding commitment of USD 400,000 within one (1) year of the later
of signing the LOI, or the renewal of the El Paso EP (Commencement Date).
JIWON will earn 51% of the EL Paso EP (or other EP’s as nominated within the JV area of influence) through
expenditure of an additional USD 600,000 (total USD 1 million) within a further 1 year, no more than 2 years
from the Commencement Date.
Provided JIWON have met the minimum funding commitment (USD 400,000), JIWON may form a
contributing joint venture with MRL Gold based on their respective interests. JIWON may continue to earn
ASX code: RMX
ABN 40 119568106
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
4
an additional 24% (total 75%) of the EL Paso EP (or other EP’s as nominated within the JV Area), through
additional expenditure of USD 1 million (total USD 2 million), over an additional 1 year but no more than a
total of 3 years from the Commencement Date, to fund exploration and other related activities.
Previous exploration for porphyry copper-gold systems on the EL Paso EP produced significant drilling
intersections of copper mineralisation including EPDD-001, 42.2m @ 0.50% Cu from 6m including 10.5m @
0.95% Cu (Mindoro Resources Ltd, TSXV release, 1 February 2010). Extensive mapping, soil geochemical
sampling and geophysics - induced Polarisation (IP) and magnetics, have defined new targets for further
drilling. These targets will be the focus of the initial JIWON drilling program.
Figure 3: Batangas Tenements, including Joint Venture Area the subject of the LOI
Company Financial Status and Outlook:
The Company raised A$600,000 (pre-capital raising costs) during the September quarter via a partially
underwritten Share Purchase Plan (SPP) (ASX release 9 September 2015). The SPP included $281,500
subscribed by Shareholders, with the remaining $318,500 of the underwritten amount subscribed by PAC
Partners Limited (Underwriter) to the total A$600,000.
Post the end of the Quarter, on 15 October 2015, the Company announced a new project level Strategic
Financing Agreement (new Agreement), with UK based Bluebird Merchant Ventures Ltd (Bluebird).
Pursuant to the new Agreement, Bluebird will increase Stage 1 Funding from US$1M to US$1.7M
(~A$2.4M), to earn an aggregate 25% interest in Red Mountain Mining Singapore (RMMS), the 100% holder
5
ASX code: RMX
ABN 40 119568106
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
of the Company’s Batangas Gold Project assets in the Philippines. Bluebird will then have two alternative
options to increase equity in RMMS to 50.1%:
a) a Sole Funding Option, prior to the DFS and permitting being completed, whereby Bluebird will
pay an additional US$1.7M, (total US$3.4M / A$4.7M) to increase equity in RMMS to 50.1%. The
Sole Funding Option may be exercised at any time up to 30 September 2016 and must be paid in
full within 10 business days of exercise, or;
b) if the Sole Funding Option is not exercised or expires, the Stage 2 Funding option, whereby an
additional US$3.8M (total US$5.5M/A$7.5M) is payable upon completion of the Stage 2 CPs,
including the DFS and final permitting. This will also increase Bluebirds equity in RMMS to
50.1%. The Stage 2 Funding option will expire on 31 December 2016, and may be extended by
agreement of all parties.
If neither option is exercised, the companies will continue to operate under a 25% Bluebird / 75% RMX
incorporated joint venture.
In addition, Red Mountain, RMMS and Bluebird have varied the Loan Agreement (see ASX release 12 June
2015) that covers any shortfall in Stage 1 Funding by Bluebird from June to November 2015. The shortfall
has been loaned by Red Mountain to RMMS and, upon receipt from Bluebird of Stage 1a and part of the Stage
1b funding on or before 27 November 2015, RMMS will immediately repay the loans totalling US$850,000
(~A$1.2M), plus interest and costs, to Red Mountain.
The new Agreement retains the benefit of providing equity at project level at a substantial premium to
current market capitalisation of the Company.
Expenditure during the September quarter totalled A$0.71 million, including exploration and DFS
expenditure of A$0.42 million.
Red Mountain held $0.51 million cash and no debt at the end of the September quarter, with approximately
US$0.85 million (~A$1.2 million) in project loans to be repaid to RMX on completion of the Stage 1a, and
part of the Stage 1b commitment pursuant to the new Agreement with Bluebird. The Company has also
submitted a Research and Develop claim to the ATO, expected to result in a refund of A$306,000 net of costs
in mid to late November 2015.
The Company continues to focus on safe and efficient exploration and development activities in harmony
with local communities and the environment. No lost time safety or environmental incidents occurred
during the September quarter.
For further information about Red Mountain please visit www.redmm.com.au or contact:
Company Investors:
Media
Jon Dugdale
Matt Birney
Managing Director
Birney Corporate
(+61) 402 298 026
(+61) 419 217 090
(+61) 8 9226 5668
(+61)8 9226 5668
E : jon.dugdale@redmm.com.au
E : matt@birneycorporate.com.au
ASX code: RMX
ABN 40 119568106
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
6
About Red Mountain Mining Limited and the Batangas Gold Project
Red Mountain Mining (ASX: RMX) is a gold exploration and development company which listed on the ASX in
September 2011. The Company’s strategy is to unlock the potential of ‘under-developed’ gold and
polymetallic projects in the greater Asian region by introducing Australian exploration and mining methods
and improving efficiencies to gain significant exploration and production upside.
The Company holds a 100% direct and indirect contractual right interest in tenements in the Philippines
that contain significant gold resources. Total Mineral Resources at Batangas include Indicated Resources of
2.97 million tonnes @ 2.4 g/t Au, 227,000oz Au and Inferred Resources of 3.22 million tonnes @ 2.1 g/t Au,
218,000oz Au for a total of 6.19 million tonnes at 2.2 g/t Au, 444,000oz Au (ASX announcement 30 June
2014, JORC 2012). The Company is continuing exploration with the objective of upgrading mineral
resources at Batangas.
The Company announced a Strategic Financing Agreement (the Original Agreement) with Bluebird Merchant
Ventures Ltd (Bluebird) on 23 December 2014. A new Agreement (the Agreement) has been signed that
includes a two stage funding arrangement totalling up to US$5.5M, that will earn Bluebird 50.1% of the
current wholly owned subsidiary, Red Mountain Mining Singapore Ltd (RMMS), that holds the Company’s
interest in the Batangas Gold Project assets in the Philippines.
Stage 1 funding of US $1.7M under the Agreement with Bluebird will allow the Company to complete a
Definitive Feasibility Study (DFS) on the project, with initial results confirming low capital and operating
costs and recovery of over 100,000 ounces of gold during the initial 5 years of a 10 year production plan
(ASX announcement 20 November 2014 and updated 23 January 2015).
Final mine Declaration of Mining Feasibility (DMF) permitting has been endorsed by all 10 Local Barangay
(township) Councils and the Company is seeking endorsement of the Lobo Municipal Council. The
Environmental Compliance Certificate (ECC) is reaching the final stages of approval and, once the Company
has the necessary two of three LGU endorsements, the DMF will proceed to central Mines and Geosciences
Bureau (MGB) for final approval and signing by the Secretary of the Department of Environment and Natural
Resources (DENR).
The Company is on the lookout for other advanced gold development and exploration opportunities, which
will be reviewed on a continuous basis.
ASX code: RMX
ABN 40 119568106
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
7
Cautionary Statement
The production targets referred to in this announcement were first released to ASX on 20 November 2014 and
updated on 23 January 2015. They are preliminary and there is no certainty that the production targets or the
forecast financial information derived from the production targets will be realised. Other than as noted in this
announcement, all material assumptions underpinning production targets or forecast financial information
derived from production targets continue to apply and have not materially changed.
Competent Person Statement
The information in this report relating to Mineral Resources and post 1 December 2013 Exploration Results is
based on information compiled by Mr Jon Dugdale who is a Fellow of the Australasian Institute of Mining and
Metallurgy and has sufficient exploration experience which is relevant to the various styles of mineralisation
under consideration to qualify as a Competent Person as defined in 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Dugdale is a full time employee and
Managing Director of Red Mountain Mining Ltd. The Company confirms that the form and context in which the
information is presented has not been materially modified and it is not aware of any new information or data
that materially affects the information included in the relevant market announcements, as detailed in the body
of this announcement. All material assumptions and technical parameters underpinning the Mineral Resource
estimates continue to apply and have not materially changed. The information in this report relating to pre
December 2013 Exploration Results is also based on information compiled by Mr Jon Dugdale who has sufficient
exploration experience which is relevant to the various styles of mineralisation under consideration to qualify
as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’. Mr Dugdale takes responsibility for and consents to the inclusion
in the report of the matters based on his information in the form and context in which it appears.
Forward Looking Statements
This announcement contains certain forward looking statements. These forward-looking statements are not
historical facts but rather are based on Red Mountain Mining’s current expectations, estimates and projections
about the industry in which Red Mountain Mining operates, and beliefs and assumptions regarding Red
Mountain Mining’s future performance. Words such as “anticipates”, “expects”, “intends”, “plans”, “believes”,
“seeks”, “estimates” “potential” and similar expressions are intended to identify forward-looking statements.
These statements are not guarantees of future performance and are subject to known and unknown risks,
uncertainties and other factors, some of which are beyond the control of Red Mountain Mining, are difficult to
predict and could cause actual results to differ materially from those expressed or forecasted in the forwardlooking statements. Red Mountain Mining cautions shareholders and prospective shareholders not to place
undue reliance on these forward-looking statements, which reflect the view of Red Mountain Mining only as of
the date of this presentation. The forward-looking statements made in this release relate only to events as of the
date on which the statements are made. Red Mountain Mining will not undertake any obligation to release
publicly any revisions or updates to these forward-looking statements to reflect events, circumstances or
unanticipated events occurring after the date of this presentation except as required by law or by any
appropriate regulatory authority.
ASX code: RMX
ABN 40 119568106
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
8
Tenement Table: ASX Listing Rule 5.3.3
Mining tenement interests held at the end of the quarter and their location
DATE OF
RENEWAL
PERIOD
EXPIRATION
PERMIT TERM
EXPIRY
1,012
29-Mar-14
20-Nov-27
4,488
5-Sep-14
PERMIT NUMBER
REGISTERED
HOLDER/APPLICANT
Lobo
MPSA-176-2002-IV
Egerton Gold Philippines Inc.
1,164
Calo
EP-IVA-006
Egerton Gold Philippines Inc.
2,493
PERMIT NAME
Archangel
Pica
Biga
El Paso
Philex
Talahib
Rosario
East Lobo
SW Lobo
Calo Extension
Batangas
Extension
MPSA-177-2002-IV
EP-IVA-007
EP-IVA-008
EP-IVA-009
EP-IVA-010
EP-IVA-011
EP-IVA-014
EP-IVA-015
EPA-IVA-093
EPA-IVA-102
EPA-IVA-103
Egerton Gold Philippines Inc.
Egerton Gold Philippines Inc.
Egerton Gold Philippines Inc.
MRL Nickel Phils. Inc.
Egerton Gold Philippines Inc.
Egerton Gold Philippines Inc.
AREA IN
HECTARES
977
26-Sep-14
20-Nov-27
5-Sep-14
*5-Sep-14
23-Oct-14
*5-Sep-14
*23-Oct-14
5,000
12-Apr-14
*12-Apr-14
873
5-Oct-13
*5-Oct-13
1,579
23-Oct-14
*23-Oct-14
MRL Nickel Phils. Inc.
2,991
20-Feb-15
20-Feb-15
MRL Nickel Phils. Inc.
166
Application
Application
3,033
Application
Application
Egerton Gold Philippines Inc.
MRL Nickel Phils. Inc.
MRL Nickel Phils. Inc.
2,461
850
20-Feb-15
Application
20-Feb-15
Application
INTEREST /
CONTRACTUAL
RIGHT
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
*Note: Exploration Permits that have reached permit expiry have been submitted for renewal.
The mining tenement interests relinquished during the quarter and their location
No mining tenements were relinquished during the quarter.
The mining tenement interests acquired during the quarter and their location
No mining tenements were acquired during the quarter.
Beneficial percentage interests held in farm-in or farm-out agreements at the end of the quarter
Not applicable
Beneficial percentage interests in farm-in or farm-out agreements acquired or disposed of during the
quarter
Not applicable
ASX code: RMX
ABN 40 119568106
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
9
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity
quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
Name of entity
RED MOUNTAIN MINING LIMITED
ABN
Quarter ended (“current quarter”)
40 119 568 106
30 September 2015
Consolidated statement of cash flows
1.1
Receipts from product sales and related
debtors
50
Year to date
(3 months)
$A’000
50
1.2
Payments for (a) exploration & evaluation
(b) development
(c) production
(d) administration
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes paid
Other (R & D Refund)
(422)
(339)
1
(422)
(339)
1
-
-
(710)
(710)
-
-
-
-
(710)
(710)
Cash flows related to operating activities
1.3
1.4
1.5
1.6
1.7
Net Operating Cash Flows
1.8
1.9
1.10
1.11
1.12
1.13
Cash flows related to investing activities
Payment for purchases of:
(a) prospects
(b) equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Other (provide details if material)
Net investing cash flows
Total operating and investing cash flows
(carried forward)
+ See chapter 19 for defined terms.
01/05/2013 Appendix 5B Page 1
Current quarter
$A’000
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
1.13
Total operating and investing cash flows
(brought forward)
(710)
(710)
572
572
572
572
Net increase (decrease) in cash held
(138)
(138)
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
1.22
Cash at end of quarter*
594
57
513
594
57
513
1.14
1.15
1.16
1.17
1.18
1.19
Cash flows related to financing activities
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other (provide details if material)
Net financing cash flows
Payments to directors of the entity, associates of the directors,
related entities of the entity and associates of the related entities
Current quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2
1.24
Aggregate amount of loans to the parties included in item 1.10
1.25
Explanation necessary for an understanding of the transactions
Director fees, executive salaries and superannuation.
116
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on
consolidated assets and liabilities but did not involve cash flows
2.2
Details of outlays made by other entities to establish or increase their share in projects in
which the reporting entity has an interest
+ See chapter 19 for defined terms.
Appendix 5B Page 2
01/05/2013
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000
-
Amount used
$A’000
-
40
-
Estimated cash outflows for next quarter
$A’000
650
4.1
Exploration and evaluation
4.2
Development
-
4.3
Production
-
4.4
Administration
245
Total*
895
* To be funded using existing cash reserves together with expected Stage 1 payments of US$850,000 / ~A$1.2
million pursuant to the Subscription and Joint Venture Agreement and variation to the loan Agreement
between Bluebird Merchant Ventures Ltd, Red Mountain Mining Singapore Ltd and Red Mountain Mining Ltd
as released to the ASX 15 October 2015. In addition the Company has lodged a Research and Development
claim to the ATO that is expected to result in a refund of A$306,000 net of costs to the Company.
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows)
to the related items in the accounts is as follows.
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
Total: cash at end of quarter (item 1.22)
+ See chapter 19 for defined terms.
01/05/2013 Appendix 5B Page 3
Current quarter
$A’000
Previous quarter
$A’000
487
558
26
36
-
-
-
-
513
594
Appendix 5B
Mining ex
Share your feedback