Red Mountain extends high grade early mining zone
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
RED MOUNTAIN MINING LTD (ASX:RMX)
04 MAY 2015
RED MOUNTAIN EXTENDS HIGH GRADE EARLY MINING ZONE BY UP TO 50M
•
•
•
High grade gold surface results of 3m @ 24.2 g/t Au including 1m @ 39.5 g/t Au
New results extend main South West Breccia lode by up to 50 metres strike length
New resource model due soon for at surface, high grade early mining target
Perth, Western Australia: Red Mountain Mining Limited (ASX:RMX) today released new, very high
grade, gold surface results from its Batangas Gold Project approx 120km south of Manilla in the
Philippines.
The results are from the South West Breccia (SWB) lode extended area, including a partially excavated
lode in Trench 38 that returned a 3.0 metre wide intersection averaging 24.2 g/t gold (Au),
including 1m @ 39.5 g/t Au excavated below previously announced high-grade boulders that
produced gold results of 33.5 g/t Au; 27.7 g/t Au and 11.5 g/t Au (released 2 March 2015).
This new high grade gold zone is the interpreted extension of the SWB Main Lode, and extends this
zone by 50 metres to the southwest of previous testing on this structure (e.g. Trench 36, SWB Main
Lode: 4.5m @ 14.8 g/t Au including 1.0m @ 44.9 g/t Au – released 2 March 2015, see Figure 1).
The lode exposure is interpreted to be steeply dipping and was not tested by a previous vertical hole
(LB02 – drilled pre 2005), drilled into the immediate hangingwall.
Red Mountain Managing Director Jon Dugdale said: “This new high grade gold intersection confirms
that we have found the extension to the Main SWB lode, which remains untested for up to 50
metres south west of previous drilling.
“There is now significant potential to add to the high grade SWB resource and early mining target
through continued trenching, and future drill testing.”
Other results included Trench 37 extended, that intersected 10m @ 1.17 g/t Au from colluvium
overlying the hangingwall lode structure (see Figure 1).
A new resource model is being prepared for the outcropping high grade early mining targets within
the 500m exposed SWB lode corridor (see Figure 2), which includes SWB Extended, Japanese Tunnel –
Trench 7 area and the Limestone Target. This will be integrated with the existing resource model for
SWB that includes an Indicated Resource of 221,000 tonnes grading 6.3 g/t Au (released as part of
the total Batangas JORC 2012 Indicated and Inferred Mineral Resource of 6.19 million tonnes @ 2.2 g/t
Au, 444,000 oz Au, released 30 June 2014), and open pit mining inventory included in the Definitive
Feasibility Study (DFS) in progress of 174,000t @ 6.8 g/t Au (released 20 November 2014).
Discussions continue with potential candidates for toll processing and/or ore sales of this early mining
resource target, that will potentially provide an early cashflow for the Company prior to the
establishment of processing facilities for the greater resource based project.
ASX code: RMX
ABN 40 119568106
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
1
Figure 1: Plan of South West Breccia with new trenching results extending SWB Main Lode
ASX code: RMX
ABN 40 119568106
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
2
Figure 2: Plan of South West Breccia Lode structure with high-grade early mining targets and new results
Trenching
Trench 38 Main
Including
Trench 37 Ext.
North
(Grid)
10,100
10,100
10,169
East
(Grid)
10,050
10,052
10,038
Azi
Mag
140°
140°
140°
From
m
0.0
2.0
0.0
Table 1: New Trenching results, South West Breccia Lode, Lobo.
To
m
3.0
3.0
10.0
Length
m
3.0
1.0
10.0
Au
g/t
24.2
39.5
1.17
For further information about Red Mountain please visit www.redmm.com.au or contact:
Company Investors:
Jon Dugdale
Managing Director
(+61) 402 298 026
(+61) 8 9226 5668
E : jon.dugdale@redmm.com.au
ASX code: RMX
ABN 40 119568106
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Media
Matt Birney
Birney Corporate
(+61) 419 217 090
(+61)8 9226 5668
E : matt@birneycorporate.com.au
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
3
About Red Mountain Mining Limited and the Batangas Gold Project
Red Mountain Mining (ASX: RMX) is a gold exploration and development company which listed on the
ASX in September 2011. The Company’s strategy is to unlock the potential of ‘under-developed’ gold
and polymetallic projects in the greater Asian region by introducing Australian exploration and mining
methods and improving efficiencies to gain significant exploration and production upside.
The Company holds a 100% direct and indirect contractual right interest in tenements in the
Philippines that contain significant gold resources. Total Mineral Resources at Batangas include
Indicated Resources of 2.97 million tonnes @ 2.4 g/t Au, 227,000 oz Au and Inferred Resources of 3.22
million tonnes @ 2.1 g/t Au, 218,000oz Au for a total of 6.19 million tonnes at 2.2 g/t Au, 444,000oz Au
(ASX announcement 30 June 2014, JORC 2012). The Company is continuing exploration with the
objectives of upgrading mineral resources at Batangas.
The Company announced Agreement with London backed, BVI registered, BMVL on 23 December
2014 which includes a two stage funding arrangement totalling US$5.5 million (~A$6.7 million),
earning BMVL up to 50% of the currently wholly owned subsidiary, Red Mountain Mining Singapore
Ltd, which is the holder of the Philippines based Batangas Gold Project assets.
Funding under the Agreement with BMVL will allow the Company to complete a DFS on the project,
with initial results confirming low capital and operating costs and recovery of over 100,000 ounces of
gold during the initial 5 years of production (ASX announcement 20 November 2014 and updated 23
January 2015).
Final mine development permitting submissions have been lodged with the Philippines Government
(ASX announcement 3 April 2014) and are proceeding towards approval.
Other gold opportunities will be reviewed on a continuous basis.
ASX code: RMX
ABN 40 119568106
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
4
Cautionary Statement
The production targets referred to in this announcement were first released to ASX on 20 November 2014
and updated on 23 January 2015. They are preliminary and there is no certainty that the production
targets or the forecast financial information derived from the production targets, will be realised. All
material assumptions underpinning production targets or forecast financial information derived from
production targets continue to apply and have not materially changed.
Competent Person Statement
The historic information in this report relating to Mineral Resources and post 1 December 2013
Exploration Results is based on information compiled by Mr Jon Dugdale who is a Fellow of the
Australasian Institute of Mining and Metallurgy and has sufficient exploration experience which is
relevant to the various styles of mineralisation under consideration to qualify as a Competent Person as
defined in 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’. Mr Dugdale is a full time employee and Managing Director of Red Mountain Mining
Ltd. The Company confirms that the form and context in which the information is presented has not been
materially modified and it is not aware of any new information or data that materially affects the
information included in the relevant market announcements, as detailed in the body of this
announcement. All material assumptions and technical parameters underpinning the Mineral Resource
estimates continue to apply and have not materially changed.
The new Exploration Results and historic information in this report relating to pre December 2013
Exploration Results is also based on information compiled by Mr Jon Dugdale who has sufficient
exploration experience which is relevant to the various styles of mineralisation under consideration to
qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Mr Dugdale takes responsibility for and
consents to the inclusion in the report of the matters based on his information in the form and context in
which it appears.
Forward Looking Statements
This announcement contains certain forward looking statements. These forward-looking statements are
not historical facts but rather are based on Red Mountain Mining’s current expectations, estimates and
projections about the industry in which Red Mountain Mining operates, and beliefs and assumptions
regarding Red Mountain Mining’s future performance. Words such as “anticipates”, “expects”, “intends”,
“plans”, “believes”, “seeks”, “estimates” “potential” and similar expressions are intended to identify
forward-looking statements. These statements are not guarantees of future performance and are subject
to known and unknown risks, uncertainties and other factors, some of which are beyond the control of
Red Mountain Mining, are difficult to predict and could cause actual results to differ materially from
those expressed or forecasted in the forward-looking statements. Red Mountain Mining cautions
shareholders and prospective shareholders not to place undue reliance on these forward-looking
statements, which reflect the view of Red Mountain Mining only as of the date of this presentation. The
forward-looking statements made in this release relate only to events as of the date on which the
statements are made. Red Mountain Mining will not undertake any obligation to release publicly any
revisions or updates to these forward-looking statements to reflect events, circumstances or
unanticipated events occurring after the date of this presentation except as required by law or by any
appropriate regulatory authority.
5
ASX code: RMX
ABN 40 119568106
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
APPENDIX 1: SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
Sampling
• Nature and quality of
techniques
sampling and Assaying
• Measures taken to ensure
sample representivity and the
appropriate calibration of
any measurement tools or
systems used.
Drilling
techniques
Drill sample
recovery
•
Aspects of the determination
of mineralisation that are
Material to the Public Report.
•
Drill type and details
•
Method of recording and
assessing core and chip
sample recoveries and results
assessed.
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
Whether a relationship exists
between sample recovery and
grade and whether sample
bias may have occurred due
to preferential loss/gain of
fine/coarse material.
Whether core and chip
samples have been
geologically and
geotechnically logged to a
level of detail to support
appropriate Mineral Resource
estimation, mining studies
•
•
Logging
ASX code: RMX
ABN 40 119568106
•
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
Commentary
• Trenches (Costeans) through
colluvial cover excavated to bedrock
have been sampled at the base of the
trench in continuous cut channels
with samples aggregated over
measured 0.5m to 1.0m intervals.
• Trenching samples obtained from cut
channels at 0.5m to 1.0m intervals
weighing less than 3kg were
transported to Intertek Laboratories
in Manila, the Philippines, for fire
assay.
• At least 2kg sample was pulverised
and a 50 gram charge fire assayed
with AAS finish for Gold (Au) and a
range of 37 elements via Multiple
determination by ICP-OES (following
four acid digest
(HCl/HNO3/HClO4/HF) with
volumetric finish) assay including
Silver (Ag), Copper (Cu), Lead (Pb)
and Zinc (Zn).
• Diamond core drilling, Triple tube,
HQ core size
• Core sample recoveries routinely
measured and recorded in
spreadsheet database
•
•
•
Triple tube drilling maximising core
recovery. Samples split half core
perpendicular to strike of structures
Recovery maximised (100%). No bias
generated.
Logging of geology, alteration and
geotechnical aspects have been
recorded in drilling logs for diamond
core drilling.
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
6
Criteria
Sub-sampling
techniques and
sample
preparation
Quality of
assay data and
laboratory
tests
ASX code: RMX
ABN 40 119568106
JORC Code explanation
Commentary
and metallurgical studies.
• Logging is qualitative. All drill core
• Whether logging is
photographed.
qualitative or quantitative in
nature. Core (or costean,
• The entire interval drilled / trenched
channel, etc) photography.
has been logged.
• The total length and
percentage of the relevant
intersections logged.
• If core, whether cut or sawn
• Half core taken, sawn.
and whether quarter, half or
all core taken.
• Non core Trench (Costean) channel
• If non-core, whether riffled,
samples entire sample aggregated,
tube sampled, rotary split, etc
not riffled or split.
and whether sampled wet or
dry.
• Aggregated half core . Entire ~2kg
sample pulverised at Laboratory
• For all sample types, the
prior to fire assay. This is an
nature, quality and
appropriate sample preparation
appropriateness of the sample
technique that minimises bias.
preparation technique.
• Drilling and Channel sampling
• Quality control procedures
orthogonal to dip and strike of the
adopted for all sub-sampling
lode provides continuous sample with
stages to maximise
even weights that maximises
representivity of samples.
representivity.
• Measures taken to ensure that
• Field duplicates regularly sampled.
the sampling is representative
of the in situ material
• Sample sizes at >2kg are well in
collected, including for
excess of requirements appropriate
instance results for field
to the grain size of gold that has been
duplicate/second-half
shown by mineragraphy to be
sampling.
generally less than 50 micron.
• Whether sample sizes are
appropriate to the grain size
of the material being
sampled.
• The nature, quality and
• Fire assay is appropriate for the
appropriateness of the
nature of the gold mineralisation
assaying and laboratory
being assayed.
procedures used and whether
the technique is considered
partial or total.
• No geophysical tools used in
• For geophysical tools,
generating exploration results.
spectrometers, handheld XRF
instruments, etc, the
parameters used in
determining the analysis
including instrument make
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
7
Criteria
Verification of
sampling and
assaying
Location of
data points
JORC Code explanation
and model, reading times,
calibrations factors applied
and their derivation, etc.
• Nature of quality control
procedures adopted (eg
standards, blanks, duplicates,
external laboratory checks)
and whether acceptable levels
of accuracy (ie lack of bias)
and precision have been
established.
• The verification of significant
intersections by either
independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary
data, data entry procedures,
data verification, data
storage (physical and
electronic) protocols.
•
Discuss any adjustment to
assay data.
•
Accuracy and quality of
surveys used to locate drill
holes (collar and down-hole
surveys), trenches, mine
workings and other locations
used in Mineral Resource
estimation.
Specification of the grid
system used.
•
•
ASX code: RMX
ABN 40 119568106
Quality and adequacy of
topographic control.
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
Commentary
•
•
Registered standards have been
inserted every 20 samples.
Levels of accuracy and precision
(detection limit) for gold is + or
minus 0.005 ppm gold, which is well
in excess of the precision required for
the level of assays reported.
•
Significant intersections reported by
field personnel, verified by competent
person.
•
No twinning of drillholes at this
stage.
Primary data logged on paper then
data entry into database, verified by
Chief Geologist and stored in
electronic database, regularly backed
up. output in spreadsheet form. Data
is verified and compared with
standard assays using established
company protocols.
No adjustments have been made to
assay data.
Drillholes and Trenches (Costeans)
accurately surveyed using Nikon
Total Station DTM-332 survey
equipment.
•
•
•
•
•
Drillhole and Trench (Costean)
locations surveyed in UTM WGS84
51N grid, converted to local Lobo
grid.
Topographic surveys were done using
the Total Station. Control stations
were set by an independent surveyor
(McDonald Consultant, Inc.) using 2
DGPS (one as a base station for
correcting diurnal variations) and a
total station for where they could not
survey with GPS under thick cover.
These were tied to known
government control stations.
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
8
Criteria
Data spacing
and
distribution
Orientation of
data in
relation to
geological
structure
Sample
security
Audits/Reviews
ASX code: RMX
ABN 40 119568106
JORC Code explanation
• Data spacing for reporting of
Exploration Results.
• Whether the data spacing and
distribution is sufficient to
establish the degree of
geological and grade
continuity appropriate for the
Mineral Resource and Ore
Reserve estimation
procedure(s) and
classifications applied.
• Whether sample compositing
has been applied.
• Whether the orientation of
sampling achieves unbiased
sampling of possible
structures and the extent to
which this is known,
considering the deposit type.
• If the relationship between
the drilling orientation and
the orientation of key
mineralised structures is
considered to have introduced
a sampling bias, this should
be assessed and reported if
material.
• The measures taken to ensure
sample security.
•
The results of any audits or
reviews of sampling
techniques and data.
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
Commentary
• Drilling assayed on no more than 1m
intervals down hole. Drilling testing
Trenches (Costeans) excavated every
10m along the strike of identified
mineralisation. Data spacing
sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource
and Ore Reserve estimation
procedure(s)
•
Samples have not been composited.
•
Drilling and Trenching (Costeans)
established orthogonal to the
interpreted strike and dip of the
mapped mineralised structures.
•
No sampling bias interpreted.
•
Samples secured by senior personnel
on site and transported directly by
company vehicle to Intertek
Laboratories, Manila, the Philippines.
Internal reviews regularly completed
but no external audits carried out to
date.
•
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
9
APPENDIX 2: REPORTING OF EXPLORATION RESULTS
Criteria
JORC Code explanation
Commentary
Mineral
• Type, reference
• The Batangas Gold Project comprises 2
tenement and
name/number, location and
Mineral Production Sharing
land tenure
ownership including
Agreements (MPSA’s), 8 Exploration
status
agreements or material
Permits (EP’s) and four Exploration
issues with third parties such
Permit Applications (EPA’s).
as joint ventures,
• Red Mountain Mining Ltd has a 100%
partnerships, overriding
interest in Philippines subsidiary MRL
royalties, native title
Gold Inc. which in turn has a 100%
interests, historical sites,
direct and contractual right interest in
wilderness or national park
the Batangas gold Project tenements.
and environmental settings.
• The Lobo and Archangel MPSA’s
contain all identified (JORC 2004)
• The security of the tenure
resources. Declaration of Mining
held at the time of reporting
Feasibility and Environmental
along with any known
Compliance Certificate will be required
impediments to obtaining a
to be approved by the Philippines
licence to operate in the area.
Mines and Geosciences Bureau of the
Department of Energy and Natural
Resources of the Philippines
Government before the company has a
licence to operate.
Exploration
• Acknowledgment and
• Previous exploration was conducted by
done by other
appraisal of exploration by
Mindoro Resources Ltd including
parties
other parties.
extensive drilling, surface
geochemistry, geophysics, mapping
and mineral resource estimation to
JORC 2004 and NI 43-101 standards.
Geology
• Deposit type, geological
• The gold mineralisation that is the
setting and style of
target of the exploration program is
mineralisation.
porphyry related epithermal gold
mineralisation hosted by intermediate
to felsic volcanic rocks and intrusions.
• Two styles of intermediate
sulphidation epithermal gold
mineralisation identified – i) andesite
hosted stockwork mineralisation at
e.g. Archangel MPSA and QuartzBarite-Sulphide vein/lode style
mineralisation at e.g. the Lobo MPSA.
Drill hole
• A summary of all information
• See Table 1,
Information
material to the
Drillhole/Trenching/Sampling
understanding of the
locations, RL, dip and azimuth, length.
exploration results including
• Also significant intersections, from, to,
a tabulation of the following
interval, grade for relevant economic
information for all Material
targets gold (Au), Silver (Ag) and
ASX code: RMX
ABN 40 119568106
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
10
Criteria
Data
aggregation
methods
JORC Code explanation
drill holes:
o easting and northing
of the drill hole collar
o elevation or RL
(Reduced Level –
elevation above sea
level in metres) of the
drill hole collar
o dip and azimuth of
the hole
o down hole length and
interception depth
o hole length.
• In reporting Exploration
Results, weighting averaging
techniques, maximum and/or
minimum grade truncations
(eg cutting of high grades)
and cut-off grades are usually
Material and should be
stated.
•
•
Relationship
between
mineralisation
widths and
intercept
lengths
•
•
•
ASX code: RMX
ABN 40 119568106
Commentary
copper (Cu).
Where aggregate intercepts
incorporate short lengths of
high grade results and longer
lengths of low grade results,
the procedure used for such
aggregation should be stated
and some typical examples of
such aggregations should be
shown in detail.
The assumptions used for any
reporting of metal equivalent
values should be clearly
stated.
These relationships are
particularly important in the
reporting of Exploration
Results.
If the geometry of the
mineralisation with respect
to the drill hole angle is
known, its nature should be
reported.
If it is not known and only the
down hole lengths are
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
•
•
Exploration results from drilling and
trench (Costean) sampling have been
weighted by interval.
No high-grade cuts have been applied
as maximum grade (12 g/t Au) is less
than five times the approximate mean
grade.
•
Lower cut-off grade of 1 g/t Au has
generally been applied to significant
intersections.
•
Aggregate drilling and trenching
intercepts do not incorporate longer
lengths of low grade results.
•
No metal equivalent reported.
•
Drilling and trenches (Costeans) have
been drilled/excavated and sampled
as close to orthogonal to the strike and
dip of the lode structures as possible
and, as such, the intersection lengths
are a close approximation of true
width.
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
11
Criteria
Diagrams
Balanced
reporting
Other
substantive
exploration
data
Further work
ASX code: RMX
ABN 40 119568106
JORC Code explanation
reported, there should be a
clear statement to this effect
(eg ‘down hole length, true
width not known’).
• Appropriate maps and
sections (with scales) and
tabulations of intercepts
should be included for any
significant discovery being
reported These should
include, but not be limited to
a plan view of drill hole collar
locations and appropriate
sectional views.
• Where comprehensive
reporting of all Exploration
Results is not practicable,
representative reporting of
both low and high grades
and/or widths should be
practiced to avoid misleading
reporting of Exploration
Results.
• Other exploration data, if
meaningful and material,
should be reported including
(but not limited to):
geological observations;
geophysical survey results;
geochemical survey results;
bulk samples – size and
method of treatment;
metallurgical test results;
bulk density, groundwater,
geotechnical and rock
characteristics; potential
deleterious or contaminating
substances.
•
Commentary
The nature and scale of
planned further work (eg
tests for lateral extensions or
depth extensions or largescale step-out drilling).
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
•
See Figures 1 and 2 and Table 1.
•
All significant drilling and trench
exploration results reported
•
Mineragraphy on SWB and Trench 7
samples indicates that gold is “free” or
associated with sulphide minerals
indicating that there is no significant
supergene enrichment
Metallurgical leaching results (release,
24/01/2014) for drillcore from both
South West Breccia resources on the
Lobo Prospect and the oxide and
transitional oxide resources at Kay
Tanda on the Archangel Prospect,
indicate that a fine grind of the
resource material to 37 micron and 75
micron respectively exhibit high total
gold recoveries of up to 97% (48 hour
leaching).
Drilling to be continued to test
identified mineralised zones on a 20m
x 20m spacing as detailed in the
release.
•
•
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
12
Criteria
ASX code: RMX
ABN 40 119568106
JORC Code explanation
• Diagrams clearly
highlighting the areas of
possible extensions, including
the main geological
interpretations and future
drilling areas, provided this
information is not
commercially sensitive.
COMPANY DIRECTORS
Neil Warburton
Non-Executive Chairman
Jon Dugdale
Managing Director
Commentary
• See Figures 1 and 2
Michael Wolley
Non-Executive Director
Shannon Coates
Company Secretary
CONTACT DETAILS
RED MOUNTAIN MINING LTD
Head Office
Unit 1, 2 Richardson Street
West Perth Western Australia 6005
www.redmm.com.au
info@redmm.com.au
13
Share your feedback
Discover