HIGHLIGHTS
•
RMX targets areas for Gold exploration at Flicka Lake, part of the Fry Lake Project area.
•
•
Target areas interpreted prospective for Gold based on open file data.
Targets cover extensions to shear zones and faults including favourable geological units.
•
Exploration team to conduct sampling as part of upcoming maiden exploration program.
•
RMX continues to review additional assets.
Red Mountain Mining Limited (“RMX” or the “Company”) is pleased to advise that it has defined priority
structural targets over its four exploration licenses prospective for gold, within the Meen-Dempster
Greenstone Belt, Ontario, Canada. The first area for investigation is the 100% RMX owned Flicka Lake claims,
the western most area in its Fry Lake Project portfolio. The structural targets focus on potential host sites for
gold lode mineralisation, which is known to occur in the broader area.
The targeting is based on mapped faults, shear zones, reported basement alteration of basement and
extensions to known zones of interest worked by other explorers. These promising features will be sampled
by rock and soil methods by the Company’s contract geologists. The Company’s contractors have confirmed
their availability and alongside the Red Mountain Mining team, are finalising the field program.
Figure 1: Flicka Lake target areas shown in pink with structural targets, faults, shears, alteration and prospects held by others . Datum UTM NAD83 zone 15
1
Background
The Fry Lake Projects are located in the Uchi region, a prolific mineral belt which has produced 32Moz Au to
date1. The Golden Patricia Mine previously operated by Barrick Gold (NYSE: GOLD) is located 12km North of
Fry Lake.
Figure 2: Fry Lake Project in relation to the Pickle Lake and Golden Patricia gold fields and basement geology. Datum UTM NAD83 zone 15.
The four tenements are based on structural targets, reported alteration, proximity to banded iron, reported
gold occurrences and porphyry intrusions. Figure 2 shows the Meen-Dempster Greenstone belt compressed
between late-stage granitic intrusions and associated fault and shear zones, in particular the Fry-McVean
East-West shear and associated banded iron.
1
S&P Global Market Intelligence, June 2023
Figure 3: Mapped geology of the Meen -Dempster Greenstone Belt and the Fry Lake properties. McVean Lake gold occurrence at lower left-hand
corner on the Fry-McVean massive shear. Note the Flicka Lake licence surrounds existing claims and known mineralisation held by others.
Table 2 summarises each tenement and provides a brief description of the target area and target
size.
2
Licence Group
Sub Target
Priority
Relyea Porphyry
P1
Lake Relyea
P2
Fry Lake Stock
Fry Lake Stock
P2
Flicka Lake
Flicka Lake
P1
McVean Lake West
P1
Fry-McVean Shear
P1
Relyea
Fry-McVean Shear
Brief Comment
Area km2
Western extension of porphyry. Felsic intrusion into clastic metasedimentary
rocks sub parallel strike, qtz-feld-porphyritic-syenite with local silicification
zones blueish translucent qtz veins potential to host gold. Poor outcrop no
11.7
historic drilling or exploration - Greenfields
Reports of a rusty qtz vein north of lake with gold lode sub parallel to main
foliation, pronounced biotite-sericite alteration in fine grained sandstone on
lineament through the Kawashe Lake #2 copper-gold occurrence.
Western margin exhibits pervasive sericite-carbonate alteration associated
with disseminated pyrite and minor tourmaline. Locally fracture controlled iron
5.8
carbonate with qtz and pyrite alteration and veining.
NE structures emanating from main E-W shear giving rise to Flicka & Fry Lake #9
Au occurrences with the later having a 50m wide Fe-carbonate rich zone in the
9.5
shear.
Lies west of historical McVean Lake Au lode occurrence in quartz porphyry
dykes and coincident with the mapped Fry-McVean Shear.
10.9
Extension of the McVean Lake West target along the Fry-McVean shear and
takes in two narrow felsic bodies
Total
37.9
Table 1: Brief summary of the four properties and their relative sizes in km2.
Projects Located in Strategic Gold District
The Pickle Lake gold mines historically reported production of 3,271,276Mt for 1,502,147oz2 from 1935 to
1966. The major gold mines and current resources, past and present, in the area are:
•
•
•
•
•
Golden Patricia (Barrick Gold NYSE: GOLD)
Pickle Crow, AuTeco Minerals report a JORC (2012) inferred resource of 11.9Mt at 7.2g/t Au for
2.8Moz (FireFly Metals ASX: FFM 4th May 2023):
Dona Lake (Newmont Corporation NYSE: NEM)
Central Patricia Mines
Kasagiminnis Gold deposit, Ardiden report a JORC (2012) Inferred resource estimate of 0.79Mt at
4.3g/t Au for 0.11Moz (ASX: ADV 10 September 2019)
2
: Data taken from the Ontario Mineral Inventory, Ontario Geological Survey Record MDI52O09SE00007
Next Steps
A first pass rock and soil sampling program is currently being prepared to test structural targets identified.
Subject to contractor availability and weather conditions, the Company expects the initial sampling process
to commence in this quarter, where the collected samples will be assayed in a local assay laboratory.
Additional Assets Being Reviewed
RMX continues to review additional asset opportunities to complement the company’s existing asset
portfolio.
Authorised for and on behalf of the Board,
Mauro Piccini
Company Secretary
3
Investors and Media
For any questions, please contact us at info@redmountainmining.com.au
About Red Mountain Mining
Red Mountain Mining Limited (ASX: RMX) is a mineral exploration and development company. Red Mountain has a portfolio of
critical minerals including gold, lithium, rare earth and base metal projects, located in Canada, USA and Australia. The Company’s
flagship projects are based in Nevada USA, prospective for lithium claystone mineralisation. Red Mountain is progressing its Fry Lake
project, based in the Strategic Gold district in Ontario, Canada. Other projects include the Monjebup Rare Earths Project and the
Koonenberry Gold Project.
Competent Person Statement
The information in this announcement that relates to Exploration Results and other technical information complies with the 2012
Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). It has been
compiled and assessed under the supervision of contract geologist Mark Mitchell. Mr Mitchell is a Member of the Australasian
Institute of Geoscientists and has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the JORC Code.
Mr Mitchell consents to the inclusion in this announcement of the matters based on his information in the form and context in which
it appears.
4
1.1 Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple
(eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed
information.
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
• Method of recording and assessing core and
chip sample recoveries and results assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
Drilling
techniques
Drill sample
recovery
Logging
Commentary
5
•
No drilling or sampling conducted to date
• No drilling or sampling conducted to date
• No drilling or sampling conducted to date
• No drilling or sampling conducted to date
Criteria
JORC Code explanation
Subsampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures
adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
• The verification of significant intersections
by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
Location of
data points
Data
spacing and
distribution
Commentary
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
6
No drilling or sampling conducted, just
pegged licences
•
No drilling or sampling conducted to date
• No drilling or sampling conducted to date
• No drilling or sampling conducted to date
• No drilling or sampling conducted to date
Criteria
JORC Code explanation
•
estimation procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
The measures taken to ensure sample
security.
Orientation
of data in
relation to
geological
structure
•
Sample
security
•
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
•
Commentary
• No drilling or sampling conducted to date
• No drilling or sampling conducted to date
• No drilling or sampling conducted to date
1.2 Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Four Active Mining Titles
Exploration
done by other
parties
• Acknowledgment and appraisal of
exploration by other parties.
• Limited exploration done in the licences,
mainly rock chip sampling by the Ontario
Geological Survey (Open File Report 6208 in
2008)
Geology
• Deposit type, geological setting and style
of mineralisation.
• No deposit identified in the tenements, but
lode style gold mineralisation is reported in
the broader area associated with shear zones
and sericite pyrite alteration, structurally
controlled by larger crustal deformational
features; underlying geology is the MeenDempster Archaean Greenstone Belt.
Drill hole
Information
• A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
• No drilling or sampling conducted
7
Claim numbers 893983 to 894170 (188 claims)
for:
1)
2)
3)
4)
Fry Lake
Fry Lake Stock
Fry -McVean Shear
Relyea Porphyry
Currently in RMX’s agents name (Andre
Belozerov) in the process of being transferred to
RMX’s name. No Known impediments to
exploration, not in any “Mining Activity
Restriction” areas
Criteria
JORC Code explanation
•
Data
aggregation
methods
•
•
•
Relationship
between
mineralisation
widths and
intercept
lengths
•
Diagrams
•
Balanced
reporting
•
Other
substantive
•
•
•
Commentary
holes:
o easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception
depth
o hole length.
If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting
of high grades) and cut-off grades are
usually Material and should be stated.
Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (e.g. ‘down
hole length, true width not known’).
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
Other exploration data, if meaningful and
material, should be reported including
8
• No drilling or sampling conducted
• No drilling or sampling conducted
• No drilling or sampling conducted
• No drilling or sampling conducted
• No drilling or sampling conducted
Criteria
JORC Code explanation
exploration
data
(but not limited to): geological
observations; geophysical survey results;
geochemical survey results; bulk samples
– size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
• The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future
drilling areas, provided this information is
not commercially sensitive.
Further work
Commentary
9
• No drilling or sampling conducted
• First pass rock chip and soil sampling
planned.
• See Diagrams in text