RED MOUNTAIN SECURES 100% OWNERSHIP OF PIONEER TUNGSTEN
Released
Released
Announcement PDF
ASX: RMX
investorhub.redmountainmining.com.au info@redmountainmining.com.au Red Mountain Mining Ltd ACN 119 568 106
RED MOUNTAIN SECURES 100% OWNERSHIP OF
PIONEER TUNGSTEN PROJECT
HIGHLIGHTS:
• Red Mountain Mining has successfully completed due diligence and has moved to secure
100% ownership of the Pioneer Tungsten Project in Montana, USA
• The Pioneer Tungsten Project, covering 209 hectares, lies adjacent to claims purchased in
November 2025 (total area also 209 hectares) by Almonty Industries (Market Cap AU$7.8
billion), hosting the Gentung Tungsten Deposit, with a mineral resource of 6.83Mt @ 0.315%
WO3; as well as the Ivanhoe and Lost Creek Mines, which are estimated to have collectively
produced 680kt of Tungsten ore in the 1950s and 1970s
• The Pioneer Tungsten Project comprises three key areas along the eastern margin of the
Mount Torrey Batholith, locally featuring massive garnet skarns, up to 25m thick. These skarns
contain Tungsten (W) mineralisation as scheelite, assaying over 0.5% WO3
• Red Mountain’s due diligence has confirmed the presence of garnet skarns within the claim
areas and the Company anticipates it will be able to rapidly define high-quality, relatively
shallow drill targets for testing at the Pioneer Tungsten Project, commencing at Greenstone
• Work has commenced to secure drilling approvals to test the Tungsten content and downdip
extensions at Greenstone
• Historical Drill results* at the Greenstone, part of the Pioneer Tungsten Project include grades:
o 10.7m at 0.48% WO3
o 5.8m at 0.43% WO3
o 7.6m at 0.42% WO3
• Red Mountain is well positioned to leverage near record high prices for Tungsten due to
supply constraints and increasing demand at a time when the US Federal Government is
actively seeking to secure a reliable domestic supply of the Critical Metal
• RMX expects to launch its initial sampling program at the Pioneer Tungsten Project in early
June 2026 and is well funded following the recent financing initiative
• The IP survey results from the Armidale Antimony-Gold Project in NSW, are expected in early
June, ahead of the RC drilling program due to commence shortly
ASX Announcement
28 May 2026
RED MOUNTAIN MINING LTD ASX: RMX INVESTORHUB.REDMOUNTAINMINING.COM.AU
2
Red Mountain Mining Limited (ASX: RMX, US OTCQB: RMXFF, or “the Company”), a Critical
Minerals exploration and development company with an established portfolio in Tier-1 Mining Districts
in the United States and Australia, is pleased to announce that it has exercised its option to acquire
100% ownership of the Pioneer Tungsten Project in the southwest of Montana, USA.
The Pioneer Tungsten Project comprises three groups of claims - the Greenstone, Mammoth and
Lost Creek prospects - along the eastern margin of the Mount Torrey Batholith (Figure 1), all with
recorded tungsten-bearing garnet skarn mineralisation. Massive garnet skarns, up to 25m thick1
are
known to occur locally in adjacent ground. These skarns contain Tungsten (W) mineralisation as
scheelite (CaWO4), assaying over 0.5% WO3.
At Greenstone all the historical Greenstone drill holes* were mineralised along their entire lengths
and returned average assays ranging from 0.34% to 0.48% over lengths of between 5.8 and 10.7m.
These values and thicknesses are similar to drilling results for the Almonty’s 6.8Mt Gentung deposit.
The geology and drill results suggest that mineralisation is open and may extend beyond existing
claims.
Red Mountain has exercised its option pursuant to the agreement announced on 30 April 2026 (refer
ASX Announcement dated 30 April 2026). The Pioneer Tungsten Project is an advanced asset
underpinned by an attractive historical drilling dataset, and its acquisition cements Red Mountain's
position as a focused Critical Minerals explorer and developer in the US and Australia. Board and
Management are pleased to have secured this acquisition and look forward to unlocking the Project's
potential as Red Mountain executes on its critical minerals strategy.
Project geology
The Pioneer Tungsten Project claims cover three key locations, Greenstone, Mammoth and Lost Creek
prospects, where the eastern margin of the Uphill Creek Granodiorite is in direct contact at surface
with the Snowcrest Range Group (Figure 1). Red Mountain’s claims encompass Tungsten-bearing skarn
mineralisation mapped and sampled in the middle of last century and a number of historical workings
still visible today. Pioneer claims also lie adjacent to claims purchased in November 20252
by Almonty
Industries (NASDAQ: ALM / TSX: AII / ASX: AII / Frankfurt: ALI1; Market Cap AU$7.8 billion), which
1
Nelson et al., 2012. https://almonty.com/wp-content/uploads/2025/11/Lentung-43-101.pdf
2
ALM press release 17/11/2025. https://press.almonty.com/almonty-advances-intent-to-become-the-leading-u-s-integrated-tungsten-producer-with-acquisition-of-gentung-browns-lake-
tungsten-project-in-montana/
RED MOUNTAIN MINING LTD ASX: RMX INVESTORHUB.REDMOUNTAINMINING.COM.AU
3
include the Gentung Tungsten Deposit, which has a total mineral resource of 6.83 Mt @ 0.315 %
WO3
3
; as well as the Ivanhoe and Lost Creek Mines, which are estimated to have collectively produced
680kt of tungsten ore in the 1950s and from 1970 to 19757
.
Figure 1: Surface geology in the Pioneer Batholith in Montana, shows the Mammoth, Lost Creek & Greenstone prospects, Almonty Industries claims & published USGS tungsten
occurrences, with the Ivanhoe & Lost Creek tungsten mines. Inset shows location of the Project. Geology after McDonald and Yakovlev (2019)4
, Zen (1988)5
& McDonald et al. (2012)6
.
3
Nelson et al., 2012. NI 43-101 Technical Report of the Lentung (renamed Gentung) Tungsten & Garnet Deposit https://almonty.com/wp-content/uploads/2025/11/Lentung-43-101.pdf
4
https://ngmdb.usgs.gov/Prodesc/proddesc_108777.htm
5
https://ngmdb.usgs.gov/Prodesc/proddesc_21817.htm
6
https://ngmdb.usgs.gov/Prodesc/proddesc_97585.htm
RED MOUNTAIN MINING LTD ASX: RMX INVESTORHUB.REDMOUNTAINMINING.COM.AU
4
The Torrey Batholith is a large volume composite complex that forms the core of the Pioneer
Mountains in southwest Montana. The batholith ranges in composition from gabbro to granite, but
is dominantly granodioritic in composition. Tungsten mineralisation occurs along the entire eastern
contact of the Pioneer Batholith where it is in contact with mid-Paleozoic carbonate-rich sedimentary
rocks (Figure 1), but to date significant mineralisation, occurring in scheelite-bearing massive garnet
skarns, has only been found where the limestones of the Snowcrest Range Group contact the Uphill
Creek Granodiorite. Significantly, there does not appear to be any skarn development or tungsten
mineralisation associated with the Grayling Lake Granite, which cuts and is therefore younger than
the granodiorite and associated skarn mineralisation.
Historical tungsten production
The earliest recorded interest in the garnet skarn hosted tungsten mineralisation surrounding the
Mount Torrey Batholith dates from the early 1950s, driven by the US Federal Government’s strategic
metal stockpiling program, with significant production recorded from the Ivanhoe and Lost Creek
mines (Figure 1). Exploration for tungsten was carried out between 1951 and 1953 around the Ivanhoe
Mine (also known as the Brown’s Lake Mine), which had been mined for copper, silver and gold in
1928 and 1929, recording production of 5.7t Cu; 647 oz Ag and 1 oz Au7
. Open pit tungsten
production from the Ivanhoe Mine commenced in October 1953 and initially ceased in 1957, with
total production during this period of 567kt at an average grade of 0.35% WO3
8
. Similar skarn-hosted
tungsten mineralisation was mined by the Minerals Engineering Company between 1952 and 1956
from a series of adits and small open pits at the Lost Creek Mine, ~5km southeast of Ivanhoe. The
total recorded production from Lost Creek during this period is 19kt at an average grade of 0.18%
WO3
8
. Both mines remained idle until 1971, when General Electric purchased the properties and rebuilt
the mill at Ivanhoe, which operated until 1975. Minor Tungsten production is also recorded from the
Greenstone Mine during the 1950s, with recorded production of 900kg of sorted ore, containing 1.2%
WO3
8
. It is estimated that total production from the district from the 1950s and 1970s is approximately
680kt of tungsten ore9
.
7
Geach, R.D., 1972. Montana: Montana Bureau of Mines and Geology Bulletin 85. https://www.mbmg.mtech.edu/mbmgcat/public/ListCitation.asp?pub_id=10086&#gsc.tab=0
8
Pattee, E.C., 1960. U.S. Bureau of Mines, Report of Investigation 5552. https://digital.library.unt.edu/ark:/67531/metadc38682/m2/1/high_res_d/metadc38682.pdf
9
Nelson et al., 2012. NI 43-101 Technical Report of the Lentung (Gentung) Tungsten & Garnet Deposit https://almonty.com/wp-content/uploads/2025/11/Lentung-43-101.pdf
RED MOUNTAIN MINING LTD ASX: RMX INVESTORHUB.REDMOUNTAINMINING.COM.AU
5
Greenstone prospect set to be rapidly progressed
As reported last month10
, the Minerals Engineering Company also completed tungsten exploration at
Greenstone during 1951, with scheelite-bearing garnet skarn mapped at surface over a strike extent
of 400m (Figure 2). Four shallow drillholes ranging in depth between 5.8m and 10.7m were collared
in the outcropping skarn and were mineralised along their entire lengths, returning average whole
hole assays ranging from 0.34% to 0.48% WO3
11
. These values and thicknesses are comparable to
drilling results for Almonty’s 6.83Mt Gentung deposit.
Based on the mapping, positive surface sampling results and the drill assays, the Minerals Engineering
Company considered that Greenstone had potential to become “…a large producer of low-grader
tungsten ore….”12
. The company planned a vertical diamond drilling program, with holes ranging in
depth from 100 feet to 1000 feet (approximately 30m to 300m) to test for the downdip eastward
extension of the outcropping mineralised skarn at the prospect (Figure 2). However, this drilling was
not completed, presumably because the company prioritised development of and production from
the Lost Creek and Ivanhoe deposits to the north.
Figure 2: (Left) Google Earth™ satellite imagery and (Right) surface geology after McDonald and Yakovlev (2019)13
, over the northern portion of Red Mountain Mining’s Greenstone
prospect, showing the location of outcropping garnet skarn mapped in 1951 by Minerals Engineering and the location of completed and planned 1951 drillholes to test for downdip
continuation of skarn mineralisation to the east. The length and average overall WO3 grade of the four completed drillholes is also shown. 1951 drillhole collars, drill assay results,
mapped garnet skarn and local faulting after Clark (1951) 14 and Pattee (1960) 15.
10
RMX ASX Announcement 30/04/2026. https://investorhub.redmountainmining.com.au/announcements/7515319
11
Clark, H.C., 1951. Greenstone Group geological mapping and assay results. Unpublished report, prepared for the Minerals Engineering Company.
12
Undated (presumed to be ca 1952), unpublished report, prepared for the Minerals Engineering Company.
13
https://ngmdb.usgs.gov/Prodesc/proddesc_108777.htm
14
Clark, H.C., 1951. Greenstone Group geological mapping and assay results. Unpublished report, prepared for the Minerals Engineering Company.
15
Pattee, E.C., 1960. U.S. Bureau of Mines, Report of Investigation 5552. https://digital.library.unt.edu/ark:/67531/metadc38682/m2/1/high_res_d/metadc38682.pdf
RED MOUNTAIN MINING LTD ASX: RMX INVESTORHUB.REDMOUNTAINMINING.COM.AU
6
Red Mountain recognises that the Mineral Engineering Company’s planned approach to test for the
eastward downdip extension of outcropping scheelite-bearing skarn mineralisation at Greenstone is
fundamentally valid and plans to follow a similar approach, although initial drilling is likely to be
reverse circulation percussion drilling and holes will be inclined to the west at approximately 50⁰ to
provide true-thickness intercepts through the skarn, which dips at approximately 40⁰ to the east. The
Company’s US geological contractor, Montana-based K C Harvey Environmental, has commenced
work to secure approval for the planned drilling program at Greenstone, which is the highest priority
activity at the Pioneer Tungsten Project.
Red Mountain well placed as US seeks to secure domestic tungsten supply
In the face of global supply shortage and Chinese control of supply chains, the US Federal Government
is actively seeking to secure reliable domestic supply of tungsten, along with other metals critical to
the US Economy.
Figure 3:: Average weekly price of ammonium paratungstate (APT) from July 2025 to April 2026. AU$ price calculated using approximate current exchange rate of US$1 = AU$1.4
RED MOUNTAIN MINING LTD ASX: RMX INVESTORHUB.REDMOUNTAINMINING.COM.AU
7
Tungsten is currently attracting near record price levels of over US$3,000 (AU$4,200) per MTU16
of
WO3, up sharply from less than US$900 at the end of 2025 (Figure 3). This sharp increase has been
driven by China moving from being a net exporter to net importer of tungsten and the continued
widespread use of tungsten carbide cutting and drilling tools in construction, metalworking and
mining; the growing use of tungsten metal in the electronics industry and as an additive to specialty
metal alloys used in aerospace, the automotive industry and defence; and its ability to substitute for
lead in many applications.
The strong increase in the tungsten price has seen the value of established tungsten producers such
as Almonty Industries surge and has also seen multiple new players enter the space.
Red Mountain anticipates that it will be in a position to rapidly define high-quality, relatively shallow
drill targets for testing during its first year of exploration on the Pioneer Tungsten Project. The location
of the Project adjacent to Almonty’s planned Gentung Mine may allow Red Mountain to efficiently
bring any economic discoveries rapidly to market and positions the Company well to potentially
engage with the major global tungsten player.
Authorised for and on behalf of the Board,
Mauro Piccini
Company Secretary
16
1 MTU (Metric Tonne Unit) = 10kg of WO3
RED MOUNTAIN MINING LTD ASX: RMX INVESTORHUB.REDMOUNTAINMINING.COM.AU
8
*Cautionary Statement
The historical results presented in this release have not been previously reported in accordance
with the JORC Code 2012, and a Competent Person has not provided sufficient detail to disclose
the results in accordance with the Code. It is possible that following further evaluation and/or
exploration work that confidence in the results may be reduced when reported under the JORC
Code 2012. Red Mountain confirms that nothing has come to the attention of the company that
causes it to question the accuracy or reliability of the results, but the company has not
independently validated the results and therefore is not to be regarded as reporting, adopting
or endorsing those results.
Disclaimer
In relying on the above mentioned ASX announcement and pursuant to ASX Listing Rule 5.23.2, the Company confirms that
it is not aware of any new information or data that materially affects the information included in the above-mentioned
announcement.
Forward–Looking Statements
Some of the statements appearing in this announcement may be in the nature of forward-looking statements. You should
be aware that such statements are only predictions and are subject to inherent risks and uncertainties. Those risks and
uncertainties include factors and risks specific to the industries in which Red Mountain operates and proposes to operate
as well as general economic conditions, prevailing exchange rates and interest rates and conditions in the financial markets,
among other things. Actual events or results may differ materially from the events or results expressed or implied in any
forward- looking statement. No forward-looking statement is a guarantee or representation as to future performance or any
other future matters, which will be influenced by a number of factors and subject to various uncertainties and contingencies,
many of which will be outside Red Mountain’s control.
Competent Person Statement
The information in this announcement that relates to Exploration Results and other technical information complies with the
2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code).
It has been compiled and assessed under the supervision of contract geologist Mark Mitchell. Mr Mitchell is a Member of
the Australasian Institute of Geoscientists and has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in
the 2012 Edition of the JORC Code. Mr Mitchell consents to the inclusion in this announcement of the matters based on
his information in the form and context in which it appears.
RED MOUNTAIN MINING LTD ASX: RMX INVESTORHUB.REDMOUNTAINMINING.COM.AU
9
About Red Mountain Mining
Red Mountain Mining Ltd (ASX: RMX, US CODE: RMXFF) is a Critical Minerals exploration and development company
focussed on accelerating development at its United States and Australia based Projects, located in Tier-1 Mining Districts.
Red Mountain is fast-tracking its Critical Minerals projects in the US and Australia, and the Board and Management is
determined to rapidly define a portfolio of advanced projects to assist the United States and other Western countries with
a reliable, high-quality source of commodity supply, including from the Company’s Armidale Antimony-Gold Project located
in NSW, Australia, which has delivered multiple high-grade antimony rock chip samples to date (up to 39.3% Sb); and its US
Critical Minerals Portfolio. comprising the Pioneer Tungsten Project in Montana, which encompasses the same geology
and exhibits the same skarn-style mineralisation as the 6.8Mt Gentung tungsten resource (owned by NASDAQ: ALM); the
Utah Antimony Project in the highly prospective Antimony Mining District of Utah, adjacent to the Antimony Canyon Project
(owned by ASX: AT4); the Thompson Falls Antimony Project with initial assay results of up to 36.5% Sb at historical mines
located near the NYSE: UAMY Antimony Smelter, and two Idaho Antimony Projects.
JOIN THE RED MOUNTAIN MINING INVESTOR HUB
Visit https://investorhub.redmountainmining.com.au for access to the Investor Hub
RED MOUNTAIN MINING LTD ASX: RMX INVESTORHUB.REDMOUNTAINMINING.COM.AU
10
Additional information about the historic exploration work undertaken by Minerals Engineering Company
(1951-56). The additional supplementary information has been included and provides the historic
exploration data on a provisional basis under the format of ASX Mining Reporting FAQ 36. The Company
advises that due to the limitations of the initial historic exploration data reviewed, the results are not JORC
(2012) compliant.
1.1 Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other
cases more explanation may be required,
such as where there is coarse gold that
has inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.
Minerals Engineering Company 1951-56
(under a US Government Defence Minerals
Exploration Administration Contract)
• Drill samples were collected using a wagon
drill rig. The drilling method is not
recorded. However field observations of the
collars suggest that the drilling method was
continuous diamond drillcore.
• It is assumed all wagon holes were drilled
until contact with the granodiorite.
• Samples were collected at 5ft intervals
down hole, azimuth taken from historic
maps and dips are unknown but shown as
inclined on the maps.
• At this stage, the drill results are considered
non JORC compliant due to the limited
information currently available.
• Subsampling techniques for the drilling (eg:
core splitting) are assumed, but not
specified.
• Surface and underground grab samples and
channel samples were also collected at
Greenstone and Lost Creek areas.
• The grab samples were spot samples and
less reliable than the channel samples
collected across the skarn.
Drilling
techniques
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(e.g. core diameter, triple or standard
Minerals Engineering Company 1951-56
• 1950’s Wagon mounted drill. The drilling
method is not recorded. However field
observations of the collars suggest that the
RED MOUNTAIN MINING LTD ASX: RMX INVESTORHUB.REDMOUNTAINMINING.COM.AU
11
Criteria JORC Code explanation Commentary
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
drilling method was continuous diamond
drillcore.
Drill
sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Minerals Engineering Company 1951-56
• No drill recovery procedures were reported
in the historical literature.
• Holes were placed at angles perpendicular
to strike in an attempt to obtain a thickness
of mineralisation, but geological maps show
the holes were drilled starting in outcrop
rather than adjacent to outcrop.
• No information is provided that can be
used to assess the relationship between
sample recovery and grade or how much
sampling bias may have occurred.
Logging • Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
Minerals Engineering Company 1951-56
• No geological descriptions or logging of
drilled intervals, channel samples or rock
chip samples is included in the reporting.
• Sample locations are plotted on a
geological map that provides a basic
lithological description.
• Additional drilling and sampling will be
required to attain further data to support
mining studies.
Sub-
sampling
techniques
and
sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in situ
Minerals Engineering Company 1951-56
• Subsampling and sample preparation
techniques are not reported.
• No QA/QC methods were reported other
than some sample splits being sent to
multiiple independent laboratories.
• It is unknown how representative the
sample splits were, but laboratory results
varied, implying either the splits were not
representative, variation in the analytical
techniques employed and/or quality of the
laboratories.
• No details provided on the sample
RED MOUNTAIN MINING LTD ASX: RMX INVESTORHUB.REDMOUNTAINMINING.COM.AU
12
Criteria JORC Code explanation Commentary
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
preparation on the grab or channel rock
samples
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
Minerals Engineering Company 1951-56
• No assay techniques were reported.
• Quality control procedures include sending
drill samples to up to four different
laboratories.
• The Minerals Engineering Company
considers the Lewis and Walker assays to
be the most representative, noting that
alternative laboratory results may
underestimate tungsten content. These
results are considered indicative and
provide a basis for further validation
through modern analytical methods.
USGS Data Sets Used
• The high resolution 2023 USGS survey
-Butte Extension MT2023) was flown
East-West by Sander Geophysics
Limited at 200m line spacing, 100m
nominal terrain clearance for the USGS
collecting magnetic and radiometric
data.
• The geology was mapped by the US
geological survey Co-operative
Geological Mapping programme
released in 2020 (GeMS) under the
geological Map Schema.
RED MOUNTAIN MINING LTD ASX: RMX INVESTORHUB.REDMOUNTAINMINING.COM.AU
13
Criteria JORC Code explanation Commentary
Verification
of
sampling
and
assaying
• The verification of significant
intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
Minerals Engineering Company 1951-56
• No follow-up drilling has been done; the
initial four holes were first pass exploratory
holes
• No follow-up sampling has been done of
the rock grab or channel samples.
Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• Minerals Engineering Company 1951-56
• Locations were taken from a historical map
using claim boundary markers.
• Rock and channel samples were located
from historical maps which were
georectified. Locations have subsequently
been field verified as accurate.
Gentung Mineral Resource
• Resource estimate report prepared in 2012
using the Canadian Institute of Mining,
Metallurgy, and Petroleum (CIM) “Best
Practices and Reporting Guidelines” for
disclosing mineral exploration information,
the Canadian Securities Administrators
revised regulations in NI 43-101 (Standards
of Disclosure for Mineral Projects and
Companion Policy 43-101 CP, and CIM
Definition Standards for Mineral Resources
and Mineral Reserves.
Data
spacing
and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been
Minerals Engineering Company 1951-56
• Drilling was first pass and limited to four
holes and resource calculations have not
yet been made with this information.
• No analytical compositing has been
reported.
• Channel samples were taken along the
trench exposing the skarn at regular
intervals sufficient for first pass delineation
RED MOUNTAIN MINING LTD ASX: RMX INVESTORHUB.REDMOUNTAINMINING.COM.AU
14
Criteria JORC Code explanation Commentary
applied. but not for resource consideration.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
Minerals Engineering Company 1951-56
• Drilling was done perpendicular to the
strike of the skarn and several dozer cuts
were made to reveal the hanging and
footwalls of the skarn and were likely used
to provide a level pad for the drilling.
• Drill appears to be generally perpendicular
to the strike within several degrees of the
curved strike of the outcrop.
• Trenching to expose the skarn was
implemented along strike and perpendicular
to strike allowing for channel and grab
samples to be collected.
Sample
security
• The measures taken to ensure sample
security.
Minerals Engineering Company 1951-56
• Details on sample security were not
documented.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
Minerals Engineering Company 1951-56
• No audit or reviews of sampling techniques
and data was reported.
1.2 Section 2 Reporting of Exploration Results
(Criteria listed in the preceding
Share your feedback
Discover